Facebook
Facebook
Twitter
Twitter
LinkedIn
LinkedIn
Email
Email
0 Comments
Comments
Prior to that, the operation was spread out over two buildings and five classrooms, with the bindery stationed in a hallway surrounded by students on their way to classes.
But the growing school needed more class space, so the in-plant gladly yielded its territory and moved into its current, much improved home, which features big windows, high ceilings and lots of extra space. Not only that, the whole shop was redesigned by an engineer to accommodate improved work flow.
0 Comments
View Comments
Related Content
Comments